30/01/2024
Always plan carefully, make as many preparations in advance as possible putting every little detail of the entire building plan in relation to family needs into consideration.
✓Plinth area: 230M²
✓4 Bedroomed all ensuite
✓Plot size: 50*100
✓Construction duration 6months
✓Finishes premium
✓Estimated construction budget 9.2M all inclusive
Bristem project value add on;
✓Modern bio digester installation
✓Kplc application and drop
✓Water connection
✓Water gutters
✓2,000 ltrs storage tank
Talk to us today;
📱 Sms/text or call 0743508804
🌎 wwwbristemdeveloers.africa
✉️ [email protected]
KAMAKIS
JENGA BILA STRESS, JENGA POLE POLE NA BRISTEM