Aarking Engineering - Private Limited

Aarking Engineering - Private Limited Aarking Engineering recognized as one of the best contractor for maritime, roads and irrigation cons

Opportunity for the candidates who are willing to join us with our team for the following designation.
24/11/2021

Opportunity for the candidates who are willing to join us with our team for the following designation.

Congratulations Aarking family, we are now CIDA   C 1
10/11/2021

Congratulations Aarking family, we are now CIDA C 1

Golden Gate Bridge construction, September, 1935.A bridge worker on the north (Marin) tower, September, 1935. Constructi...
16/05/2021

Golden Gate Bridge construction, September, 1935.

A bridge worker on the north (Marin) tower, September, 1935. Construction of the Golden Gate Bridge commenced on January 5, 1933 and lasted four and a half years, at a cost of over 35 million dollars. The landmark structure is one of the largest suspension bridges in the world. Connecting Marin County and the peninsula of San Francisco, the bridge spans the entrance to the Golden Gate. This image is from a collection of nearly 100 period photographs documenting the bridge's complex and often dangerous construction process. These photographs were commissioned by the Associated Oil Company and taken by photographer Charles M. Hiller between 1933 and 1936.

12/05/2021
31/03/2021

Amazing Vehicle parking lot..

With a main span of 650 meters, Yangbaoshan grand   of Guiyang-Huangping Highway stretches 1,112 meters in length in sou...
26/03/2021

With a main span of 650 meters, Yangbaoshan grand of Guiyang-Huangping Highway stretches 1,112 meters in length in southwest China's .

The construction of the bridge has entered the final stage of steel truss beam installation.

Project Completed by Aarking Engineering.Rehabilitation of Break water at Nilwella fishery harbour
13/03/2021

Project Completed by Aarking Engineering.

Rehabilitation of Break water at Nilwella fishery harbour

12/03/2021

Thermoplastic paint for tactile ground surface indicators.

Project Completed by Aarking Engineering.Rehabilitation of Gajabapurawewa Tank Welioya.
08/03/2021

Project Completed by Aarking Engineering.

Rehabilitation of Gajabapurawewa Tank Welioya.

Takaosan Interchange and Tunnels , Japan
04/03/2021

Takaosan Interchange and Tunnels , Japan

03/03/2021

Here's how to make a paved road. It looks like a cake texture!!

Hoover Dam is a concrete arch-gravity dam in the Black Canyon of the Colorado River, on the border between the U.S. stat...
28/02/2021

Hoover Dam is a concrete arch-gravity dam in the Black Canyon of the Colorado River, on the border between the U.S. states of Nevada and Arizona. It was constructed between 1931 and 1936 during the Great Depression and was dedicated on September 30, 1935, by President Franklin D. Roosevelt. Its construction was the result of a massive effort involving thousands of workers, and cost over one hundred lives. Originally known as Boulder Dam from 1933, it was officially renamed Hoover Dam for President Herbert Hoover by a joint resolution of Congress in 1947.

Address

No 576, Kandy Road
Mahara
11850

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 13:00

Telephone

+94113618888

Alerts

Be the first to know and let us send you an email when Aarking Engineering - Private Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Aarking Engineering - Private Limited:

Share

Welcome to Aarking Engineering

Our company was established in 1998 as a sole proprietorship and Re-established as Chanaka Metal (Pvt) Ltd in year 2003. From our inception, We are continuing our construction and material supply activities whilst winning the heart of our clients. In year 2017, We changed the name of the company as Aarking Engineering (Pvt) Ltd.