Architectural Wonders Of The Modern World
8. The Louvre, Abu Dhabi
The Louvre Abu Dhabi is an art and civilization museum, located in Abu Dhabi, UAE. The museum was established on November 8, 2017.It is part of a thirty-year agreement between the city of Abu Dhabi and the French government. The museum is located on the Saadiyat Island Cultural District. It is approximately 24,000 square metres (260,000 sq ft) in size, with 8,000 square metres (86,000 sq ft) of galleries making it the largest art museum in the Arabian peninsula. The final cost of the construction is expected to be about €600 million In addition, US$525 million was paid by Abu Dhabi to be associated with the Louvre name, and an additional US$747 million will be paid in exchange for art loans, special exhibitions and management advice.
Artworks from around the world are showcased at the museum, with particular focus placed upon bridging the gap between Eastern and Western art.
Architecture
Fountain of light by Ai Weiwei.
The museum is designed as a "seemingly floating dome structure"; its web-patterned dome allowing the sun to filter through. The overall effect is meant to represent "rays of sunlight passing through date palm fronds in an oasis.The total area of the museum will be approximately 24,000 square metres (260,000 sq ft). The permanent collection will occupy 6,000 square metres (65,000 sq ft), and the temporary exhibitions will take place over 2,000 square metres (22,000 sq ft),
Engineering
BuroHappold Engineering provided multidisciplinary engineering services across the project, including structural engineering, geotechnical engineering, energy and environmental consultancy, water engineering, facade engineering, lighting design, people movement consultancy, security services and inclusive design. Their structural engineers realised the “floating dome” from 7,850 aluminium stars of varying sizes, which tessellate over eight layers to create a perforated roof structure that allows sunlight through to the spaces below. A team of specialist geotechnical and water engineers designed a watertight basement and tidal pools within the galleries to give the illusion of a “museum in the sea” while protecting artwork, artefacts and visitors from the corrosive marine environment.
Construction
Construction works at Louvre Abu Dhabi officially started on 26 May 2009. Mohammed bin Zayed Al Nahyan, the Crown Prince of Abu Dhabi and the President of France, Nicolas Sarkozy inaugurated an exhibition titled, Talking Art: Louvre Abu Dhabi at the Gallery One of the Emirates Palace Hotel which includes 19 works of art bought over the last 18 months for the Louvre Abu Dhabi, as well as loans from the French national museums to mark the beginning of the construction work. Piling works In Louvre were to be completed by August 2010, with the piling and enabling works package awarded to the German specialized company (Bauer International FZE) The total of 4536 piles consisted of RC Piles and H-Piles and was completed on 3 August 2010.
On 29 October 2011, Tourism Development & Investment Company (TDIC.), the project manager owned by the government of Abu Dhabi, announced it would delay establishing the museum. The company gave no new date. According to the UAE newspapers Gulf News and The National, the delay could be explained by a review of the emirate's economic strategy.
In January 2012 it was confirmed that the Louvre Abu Dhabi's new opening date would be 2015.
Construction on the main phase of the museum began in early 2013 by a consortium headed by Arabtec, Constructora San José and Oger Abu Dhabi. This stage includes waterproofing and the two basement levels, along with four concrete pillars that will support the 7,000-tonne dome.
Work on the construction of the gallery spaces and initial preparation for the dome began in the fourth quarter of 2013. On 5 December 2013, the first element of the museum's canopy was lifted into place.
On 17 March 2014 TDIC announced the completion of the first permanent gallery structure to mark the first anniversary of the start of construction. At this time, it was claimed that a total of ten million man hours had been worked and 120,538 cubic meters of concrete used.
On 22 September, the final super-sized element in the canopy was fitted in place, marking a significant milestone in the museum's construction phase. In October, The Tourism & Development Investment Company announced that the Louvre Abu Dhabi was more than 50 percent complete.
Source:- Travelstart / Wikipedia