08/10/2026
Transformer Installation Works | Transformer Vacuuming | Moragolla Hydropower Station
As part of the transformer installation works at the Moragolla Hydropower Station, our team carried out transformer vacuuming to ensure proper preparation and reliable performance of the transformer system
From careful preparation to technical ex*****on, every step is carried out with a strong focus on safety, quality, and reliability.
New Royal Electricals (Pvt) Ltd
Your Preferred EPC Contractor
Discover more about NRE:
🔗 https://www.nregroup.lk/