15/08/2025
After successfully drilling a 2lps borehole, today we started the supervision and construction of a solar-powered water reticulated system.
Before construction phase, It's been an exciting experience for our designing engineers working on mapping distribution points (kiosks), hydraulic designs (TDH, pump selection and pump installation sketch), modelling the system and suitable engineering drawings.
You are in irrigation farming, water service provider, construction project management, Geophysical Surveys, Hydrogeological Road Investigation, Geotechnics, etc. Call us today!