19/11/2022
This week at Ixora!
Things are moving along nicely and we’ve been able to remove some of the polines (upright supports), which is encouraging and makes getting around a lot easier.
The back staircase, which will have the rooftop access, has stair treads being poured, so by the end of next week we’ll have stairs to the roof! Thank goodness, because I am not going back up there without stairs!
On the second floor access hallway, the crew is preparing to connect the new wall to the extension of the volado (overhang), which gives us lots of support, privacy and shelter.
We have a cuidador (caretaker) that sleeps on-site to keep watch over the house & materials, who we are super thankful for.