18/05/2022
Following the mock-up test on the waterbag the other day, here we delivered the actual load test on NAGA 8 offshore platform.
The test was conducted on a burner boom to check on the structural integrity and held for 15 minutes.
If you have such a requirement for a test, or a test in need of some waterbag assistance get in touch for more assistance.