Alfa Bangsar, located at Jalan Maarof, KL, was completed in November 2024 with an overall project duration of 6 months.
Our job scope of work included:
🌴 Hardscape
- Timber decking at the BBQ area using Brown Belian Ironwood.
- Cascade water feature wall finished with black Lampang mosaic tiles.
- Subsoil drainage along the planter box
🌴 Softscape
- Façade planting with built-in planter boxes, street planting, and sky garden.
- Turf, shrubs, trees, groundcovers, and climbers planting works including providing soil mix, mulching and staking
🌴 M&E (Mechanical & Electrical)
- Garden pole lights to illuminate the sky garden at night for safety, along with tree up lights to create ambient lighting.
🌴 C&S (Civil & Structural)
- BBQ area, including the grill top and stainless-steel sink.
🌴 Other specialties work
- Playground and outdoor fitness flooring using EPDM rubber
🌴 Maintenance
- Hardscape and softscape maintenance for a duration of 24 months.