Me-Aline Engineering Sdn Bhd

Me-Aline Engineering Sdn Bhd Science, Technology & Engineering

25/04/2018

OUR SERVICE
1) We provide Technical service - Proposal Layout Design & Workshop set up
2) Build up Centralized Gas Manifold & Piping System
3) Build up Centralized Fume & Exhaust Extraction System
4) Build up Centralized Safety & Environment System
5) Build up Centralized Dust Extraction System
6) Build up Centralized Hyegene Requirement Test
7) Build up Centralized Welding application
8) Build up Centralized Electrical Distribution System
9) Build up Centralized Sub-Board & Control Panel
( Overcurrent and Earth Fault - Relay Calibration )
10) Proposal and Preparing BQ Tender Documents

17/12/2017

ME-Aline Engineering Sdn Bhd
TOTAL SOLUTION CONTRACTORS - System and Technical Build Up.

Member-DEWAN PERNIAGAAN MELAYU MALAYSIA (WP)
PERSATUAN INDUSTRI KEJURUTERAAN (M&E) BUMIPUTRA

M&E Engineering Consultant/Technical Provider (Overcurrent and Earth Fault-Relay Calibration). Specialized in Centralized Safety and Environment control. Build up Electrical Distribution Panel and Control Calibration System, Centralized Air Compressor System. Specification Certified Required JKKP/JAS/Suruhanjaya Tenaga.

WE FORECAST.
BUILD UP AND PROVIDE DISTRIBUTION PANEL AND CALIBRATION INVERSE TIME-OVERCURRENT AND EARTH FAULT /RELAY CALIBRATION.

POWER FACTOR
Power Factor is the ratio of Active Power to Apparent Power, its maybe imposed with a power factor surcharge . Power factor is the index used to measured efficient electricity use. The index is the measured from the range of 0 to 1. A higher Power Factor index reflects a more efficient level of electricity usage. Likewise a lower index reflects wastage of electricity , this can shorten a lifespan of electrical equipment and result in losses as well as TNB.

KW - Working Power/Active Power.
This is the power that enables an electrical equipment require.
KVAR - Reactive Power.
This is the power required to generate the device such as motors ,
relays and transformers. Most equipment required motor to run the
operation.
KVA - Apparent Power.
This is the ratio of KW to KVAR

ENVIRONMENT WORKABILITY REQUIREMENT JKKP(DOSH)JAS(DOE) WORK AND SAFETY .
Due to Environment effect on work and safety proposition of our ozone , we wish to share our engineering concept. The system have successfully proven implemented to most training center and industrial use according to government act Hygiene Requirement. System should be able capture Noxious Fume Gases and Dust complying by filtering system separated through Filter Box separating particle, Air Born Dust and produce fresh air for the environment .
Different environment act requirement for the different concept of workability such as work place safety requirement (JKKP-Akta 514) outlet of building requirement and (JAS-Akta 127). It was stated under Quality Environment and was mentioned on order.

BACK UP SERVICE
Installation and service maintenance Air Conditioning work and electrical work inspection.

Address

Wisma Puspanita, JKR 5171, Jalan Hose
Kuala Lumpur
50460

Alerts

Be the first to know and let us send you an email when Me-Aline Engineering Sdn Bhd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category