12/10/2026
At the CIDB Convention Centre in Kuching, the challenge was a circular, split-level double standing seam roof that required careful planning at every stage.
From the geometry of the roof panels to their tapered terminations, every detail had to be considered.
But one of the biggest challenges was the installation itself.
Certain sections couldn’t be worked on simultaneously, which meant simply putting more people on the job wouldn’t make things move faster. The solution came down to sequencing. Understanding how each section connected to the next, planning the installation order, and making sure every stage was completed with precision.
Because good engineering is as much about how something gets built as it is about what gets built.
Together, We Do It Well.