Realisasi Mahligai

Realisasi Mahligai Realisasi Mahligai is an Expert for Bungalow Design & Build.

26/08/2026

Flooring with natural wooden looked will enhance your space

03/08/2026

RC piles must be hammered until it ‘SET’. Normally, when it set, it means the piling has enough friction to withstand the building load or the RC piles already reached the bedrock.

03/08/2026

The soil condition is really soft even the RC pile was straight embedded into the soil without hammering. In this situation, the RC pile has to be extended by other RC Pile and joint must be welded.

03/08/2026

Piling work is very important for a building structure stability. The process started with soil test procedure to find out the soil profile and strength. Then the filing method will be determined and for this Site, driven piles (Hammered Precast Concrete) was chosen as the foundation piling method.

28/07/2026
Antara yang terawal   &build
28/07/2026

Antara yang terawal

&build

Address

Serintin Points
Mantin
71700

Opening Hours

Monday 08:30 - 17:30
Tuesday 08:30 - 17:30
Wednesday 08:30 - 17:30
Thursday 08:30 - 17:30
Friday 08:30 - 17:30
Saturday 08:30 - 13:00

Telephone

+601113131300

Alerts

Be the first to know and let us send you an email when Realisasi Mahligai posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share