16/01/2023
Besides few others, one team of DV Nineteen is currently constructing GROUND BEAM. They prepared and excavated the identified areas (after calculation) based on its level then formwork installation will take place according to the dimensions of beam provided in the design drawings. After finishing shuttering or placement of flat soling bricks for the bottom of the grade beam, reinforcement placement begins directly or after side one side of the formwork is placed. Finally, pouring concrete. Poured concrete shall be compacted adequately then finish the top of grade beam.
But what is the purpose? Without fancy term, it’s basically to support building walls and disseminate the tense or loads from the floor slabs.