22/01/2026
. PART 1 #đˇ
"Today, we are conducting a systematic deconstruction of the corrugated fiber cement roof system and its underlying timber framework. The scope includes the abatement of all external sheeting, followed by the controlled dismantling of the purlins and rafters. All structural members will be lowered safely to ground level for site waste segregation and recycling." đˇđĽ