12/12/2025
Project: Electrical & Mechanical Installation Works at Durin Booster Station, Sibu
Completion Date: 04.10.2025
Job Scope:
1. Install armoured cable for MSB, genset & water pumps
2. Internal wiring works
3. Aircond installation
4. Streetlight installation
5. Lightning protection system installation
6. Genset’s Automatic Mains Failure (AMF) system installation