Saye building construction and general contractor

Saye building construction and general contractor Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Saye building construction and general contractor, Contractor, ijoka, Akure.

I'm into building construction like:
*Building a house from foundation to handin over key to the owner.
* Supplying of blocks both "6 and "9
*renovating of old building.
*plastering
* Supervising of any kind of site work
*Supplying both granite and sand

It is not too late for you to become a landlord, take a step today.
08/06/2025

It is not too late for you to become a landlord, take a step today.

We build, we plaster, we construct, we supervise, we supply any kind of building materials across the country
14/12/2024

We build, we plaster, we construct, we supervise, we supply any kind of building materials across the country

Formwork is a temporary structure used to support concrete until it hardens and becomes self-supporting. Formwork can be...
09/10/2024

Formwork is a temporary structure used to support concrete until it hardens and becomes self-supporting.

Formwork can be made from wood, steel, aluminum, plastic, and other materials. It functions like a mould and is used to cast concrete.

Formwork plays a vital role in the construction of concrete structures. Because they help ensure the stability and reliability of the project.



The days where ur strength will fail you is fast approaching daily as a man.Make sure it does not meet u in a R£nted apa...
08/06/2024

The days where ur strength will fail you is fast approaching daily as a man.
Make sure it does not meet u in a R£nted apartm£nt. Try as much as possible at your early age.

29/05/2024

You only need about 80bags of cement to build 2 or 3 bed room apartment up to Lintel level

And about 3000 blocks only.

Go and Buy that Land today

This is the break down of how and one my client got half plot and prepared all necessary d0cuments

We bought half plot of Land ( )

I prepared the deed of Assignment by my lawyer for 10% of the amount we bought the land.

We prepare the surv£y plan at a pady pady pric£ as na my own person.

We b0ught 500 blocks at 550x600=330k

Out of the 600 blocks, we use 250 for dwarf fence and used the remaining to build foundation for 2 bed room Flat.

And ever since then
Each month, I disturb him to at least buy 100 blocks and one bag of cement and do something on it monthly.

Ignorance is not an excuse to remain a tenant at retirement age, when your str£ngth is failing... Bewise

🙂🙂🙂🙂..Avoid buying a slopy land....But if you must buy, have it in mind that, 1,Building on it will cost more,2,It requi...
25/05/2024

🙂🙂🙂🙂..Avoid buying a slopy land....But if you must buy, have it in mind that,
1,Building on it will cost more,
2,It requires specialised foundation design,
3,it can be challenging while building
4,High maintenance cost
5,It needs additional Structural support
Etc.

09/04/2024

I'm capable at what I'm doing....

12/03/2024

Work in progress at Adebayo ado ekiti.

20/02/2022
20/02/2022
We're still on the matter
21/01/2022

We're still on the matter

Address

Ijoka
Akure

Website

Alerts

Be the first to know and let us send you an email when Saye building construction and general contractor posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category