The concrete slab is completed, the canopy columns are being poured, and the steel is arriving by the truck load.  Rain ...
05/09/2012

The concrete slab is completed, the canopy columns are being poured, and the steel is arriving by the truck load. Rain have caused a few delays but overall the project is still on schedule and major construction targeted to be completed by the end of NOV. by the grace of GOD. The walls of the hospital will be being erected in the next couple of weeks - KUNLE DAVID(Director of Operatios)