Denco Housing

Denco Housing The future of cost-effective houses in social housing construction. "Giving you best of housing system."

*Drawing Of Building Plans
*Building Design
*Civil work
*Site Investigation
*Site Management
*Consultancy
*Setting Out Work

23/11/2016

The lady next door just came in drunk and has been knocking on her own door for over an hour..
And she lives alone., i don't know if i should go and tell her that SHE is not around.😀😀

20/11/2016

Bleeding In Concrete


Concrete Bleeding is predicted but if it is extreme it may cause issues. This text will clarify Bleeding in detail.

The largest factor in bleed water is the water-to-cement ratio. An Increased ratio can result in extreme bleeding. The cement type and fine aggregates can play an important role in figuring out the bleed rate. The less fines you’ve in your mix, the more bleeding will happen. Factors also include concrete height and strain. The connection between bleed water and concrete heights begins off as linear, however ultimately turns into nonlinear at elevated heights.


What’s Concrete Bleeding?
Bleeding in fresh concrete is the process in which free water throughout the mix is pushed upward to the surface because of settlement of heavier particles similar to cement and water. Bleeding of the water continues till the cement paste has hardened enough to finish the sedimentation process.

Effects caused by Concrete Bleeding
• As a result of bleeding concrete loses its homogeneity.
• Bleeding is liable for inflicting permeability in concrete.
• Bleeding can sometimes reduce the bond between cement paste and aggregate. In this process bleed water accumulates under the aggregate creating voids resulting in reduction in strength of bond between cement paste and aggregate. This process results in reduction of concrete strength.
• Similarly, water that accumulates beneath the reinforcing bars, notably under the cranked bars, reduces the bond between the reinforcement and concrete.
• If a slip type paver is used for building of concrete pavement, the bleeding water can cause critical issues. If an excessive amount of of bleeding water accumulates on the surface of pavement slab, it can lead to collapse of sides.
• In pavement construction bleeding water is one of the causes of delayed surface finishing and curing compound application.

19/11/2016

Aggregate Absorption:

Aggregate can absorb water up to 2 % by weight when in bone dry state, however, in some cases the aggregate absorption can be as high as 5%. Aggregate absorption is used for applying a correction factor for aggregates in dry condition and determining water demand of concrete in saturated surface dry condition.

19/11/2016

IT'S A THAT CANCELS

If you like to be a participant of MMM NIGERIA please register through the link belowhttp://nigeria-mmm.net/?i=davidldem...
18/11/2016

If you like to be a participant of MMM NIGERIA please register through the link below
[email protected]" rel="ugc" target="_blank">http://nigeria-mmm.net/?i=[email protected]

This is a community of ordinary people, selflessly helping each other, a kind of the Global Fund of mutual aid. This is the first sprout of something new in modern soulless and ruthless world of greed and hard cash. The goal here is not the money. The goal is to destroy the world's unjust financial…

17/11/2016

Don’t Seek an Answer If You Don’t Have The Courage

29/05/2016

In 1985, IBB was the president of Nigeria and our teachers told us that Buhari was the former President....Our teacher also called us the leaders of tomorrow....31 years now, Buhari is still the President....its either our teacher lied to us about being the leaders of tomorrow...or tomorrow hasn't come. Happy Democracy Day.

16/05/2016

Check this out. Its very interesting and Educative. If:
A B C D E F G H I J K LM N O P Q R S T U V W X Y Z
Is equal to;
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Then

H+A+R+D+W+O+R+K ;
8+1+18+4+23+15+18+11=98%

K+N+O+W+L+E+D+G+E ;
11+14+15+23+12+5+4+7+5=96%

L+O+V+E;
12+15+22+5 = 54%

L+U+C+K ;
12+21+3+11 = 47%

None of them makes 100%.
Then what makes 100% ???

Is it Money?
NO !!!

M+O+N+E+Y= 13+15+14+5+25=72%

Leadership?
NO !!!

L+E+A+D+E+R+S+H+I+P= 12+5+1+4+5+18+19+8+9+16=97%

Every problem has a solution, only if we perhaps change our "ATTITUDE".

A+T+T+I+T+U+D+E ;
1+20+20+9+20+21+4+5 = 100%

It is therefore OUR ATTITUDE towards Life and Work that makes
OUR Life 100% Successful..

Address

6 Joceco Drive Ekpan
Warri
234

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 10:00 - 15:30

Telephone

+2348153187828

Alerts

Be the first to know and let us send you an email when Denco Housing posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Denco Housing:

Share