05/06/2026
Big step forward for hybrid energy assets in Sweden⚡
We are proud to have contributed as a supplier to Alight’s newly operational BESS project in Katrineholm — a strong example of how solar and storage together unlock real system value.
The 2 MW / 2 MWh battery, integrated within a 6 MWp solar park, is now fully operational and prequalified to deliver ancillary services to Svenska kraftnät. By sharing grid connection and infrastructure, this hybrid setup maximises efficiency while enabling fast-response grid balancing.
Solutions like this are key to:
• Strengthening grid stability
• Increasing flexibility in renewable power systems
• Accelerating the energy transition
Projects like Katrineholm highlight the growing role of hybrid assets in building a more resilient and sustainable energy system.
👏 Great collaboration with Alight and partners — we’re excited to keep building the future of energy together.