08/02/2026
Full site prep from start to finish β
Pre-site levelling completed, trenches dug and backfilled for contractors, then the section levelled ready for topsoil.
160mΒ³ of topsoil carted in and spread across the full house site β now ready for sowing grass π±
Higgins Site Works | Gisborne
DM us for site levelling, trenching & topsoil work.