03/04/2026
120m² Concrete Job – Built to Suit the Site
This one was on a steeper hill, so it needed more than just a standard pour.
We boxed it with a concrete retaining edge instead of timber — giving a stronger, longer-lasting result without future maintenance.
To finish it off, we used a broom finish for added traction, making it safer underfoot and for vehicles.
✔ 120m² standard concrete
✔ Concrete retaining edge (no timber)
✔ Broom finish for extra grip
✔ Built to suit the terrain
Not every job is the same — and getting these details right makes all the difference.