08/06/2026
Its been a hectic month for the 2 of us getting stuck in to get a roof on this little beauty.
Crazy lucky to have absolutely no rain on any of the timber framing.
Roof on and the next day it rained š
Exciting to also work along side installing this mighty window which is approximately 500kg.
The rest of the stunning solid timber larch windows are getting installed in around 2 weeks.
While we wait, we're back in the Tron getting stuck into a few jobs where some awesome clients have been waiting for us.