10/06/2026
Big project on tuki tuki road coming to an end. Driveway installed, pavers laid and surrounded with decorative aggregate, about 50 linear meters of concreted timber edging installed. Frame for folding washing line built and installed. Lawn prepped, sowed and grown. River stone overs supplied and installed along edge of turnaround bay.
On the backside of the property, we had to excavate and shift about 20 cubic meters of topsoil back up a rough hill that served as a stockpiled/dump during the site cut.
All this soil was used to prep the lawn, contour the hill around the lawn edge and fill several areas where gardens will be installed during the next stage.