The Toolman Building & Maintenance Services

The Toolman Building & Maintenance Services we specialise in fencing, decks, retaining walls & Alterations and bathroom work, as well as general maintenance

The plumbing and electrical are all done, insulation is in and the gib linings are nearly finished.
21/08/2025

The plumbing and electrical are all done, insulation is in and the gib linings are nearly finished.

Stage 2 of kitchen renovation. The design of the new kitchen has been finalized, I have now removed the rest of the exis...
19/08/2025

Stage 2 of kitchen renovation. The design of the new kitchen has been finalized, I have now removed the rest of the existing kitchen and the wall linings. The plumber and the electrician are coming tomorrow to do their part, then insulation in and new wall linings on.

The steel beam arrived and is fixed in place. The temporary propping has been removed and the frame the new kitchen cabi...
23/06/2025

The steel beam arrived and is fixed in place. The temporary propping has been removed and the frame the new kitchen cabinetry backs on to is in place.

Kitchen job; wall removed and temporary propping in place. Then cut pocket for steel beam to be lifted and fixed in plac...
22/06/2025

Kitchen job; wall removed and temporary propping in place. Then cut pocket for steel beam to be lifted and fixed in place, then temporary propping can be removed.
The steel beam is due on site tomorrow morning (Monday) fingers crossed 🤞

A couple of small jobs done last week while waiting for the steel beam for the kitchen job.Some garden edging at one job...
22/06/2025

A couple of small jobs done last week while waiting for the steel beam for the kitchen job.
Some garden edging at one job and posts and netting and diagonal wiring for plant to grow and be attached to.

Day one on a kitchen renovation. Demolition; removed part of the kitchen, but left the the sink and cooking area operati...
09/06/2025

Day one on a kitchen renovation. Demolition; removed part of the kitchen, but left the the sink and cooking area operational for as long as possible; removed old pantry and strip wall linings.

A recent job in Omokoroa. Built a raised garden for the kids to have a vege garden and paved a small area for a path.
24/05/2025

A recent job in Omokoroa. Built a raised garden for the kids to have a vege garden and paved a small area for a path.

Today's job in between the showers was extending an existing fence
28/04/2025

Today's job in between the showers was extending an existing fence

Latest project. Replacing 4 sections of rot damaged fencing, the posts had rotted through at ground level, so had to kan...
04/04/2025

Latest project. Replacing 4 sections of rot damaged fencing, the posts had rotted through at ground level, so had to kango them out.

Today's job was to install the powder coated aluminium handrails on the stairs I installed late last year in Omokoroa
18/02/2025

Today's job was to install the powder coated aluminium handrails on the stairs I installed late last year in Omokoroa

Old steel framed stairs removed and new timber ones installed. Just waiting on the handrail to arrive so I can install i...
22/11/2024

Old steel framed stairs removed and new timber ones installed. Just waiting on the handrail to arrive so I can install it and it'll be completed.

Here's a some pics of a couple of gates gates installed earlier this week at a Day Care in Omokoroa. This will stop the ...
22/11/2024

Here's a some pics of a couple of gates gates installed earlier this week at a Day Care in Omokoroa. This will stop the children running out into the carpark and the road as they leave the centre

Address

Omokoroa
3114

Opening Hours

Monday 8:30am - 4pm
Tuesday 8:30am - 4pm
Wednesday 8:30am - 4pm
Thursday 8:30am - 4pm
Friday 8:30am - 4pm

Website

Alerts

Be the first to know and let us send you an email when The Toolman Building & Maintenance Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share