25/09/2026
Kawau Island update.
Massive push from the boys over the last couple of weeks. With extremely challenging tidal conditions and a lot of mud, we are now out of the ground and have the subfloor built ready for flooring and frames next week! This has been a huge milestone and we are all stoked to be on track for the house to get lifted the next 800mm while we get our frames stood and braced and lower the house back down to settle on the new frames.
👀