“Concreting preparations of THIRDFLOOR SUSPENDED SLAB & BEAM, Three STOREY RESIDENTIAL unit located at TRES BORCES MABOLO CEBU CITY” TATAK QUALITY

🏗️ PROJECT UPDATEConstruction of a Three-Storey Commercial Building📍 Santander, CebuFrom foundation to structural works,...
28/03/2026

🏗️ PROJECT UPDATE

Construction of a Three-Storey Commercial Building
📍 Santander, Cebu

From foundation to structural works, our team continues to deliver precision, strength, and quality workmanship on every detail.

Thank you for trusting QPD Construction — where quality is not just a standard, it’s our identity.

💪
🏗️
📍
🔨

On-going Works: Formworks & Deformed Bars InstallationProject: Construction of 3-Storey Residential BuildingCurrent Prog...
28/03/2026

On-going Works: Formworks & Deformed Bars Installation
Project: Construction of 3-Storey Residential Building
Current Progress: Third Floor Structural Works
Location: Mabolo, Cebu City

Steady progress on site as we continue with the third floor formworks and deformed bars installation, ensuring structural accuracy, strength, and quality workmanship for every stage of the build. 🏗️💪

TATAK QUALITY

🔥QPD Construction
16/03/2026

🔥QPD Construction

“Preparation for CONCRETE pouring of SECONDFLOOR SUSPENED SLAB & BEAM”   TATAK QUALITY
14/03/2026

“Preparation for CONCRETE pouring of SECONDFLOOR SUSPENED SLAB & BEAM” TATAK QUALITY

08/03/2026

STEPS IN SLAB ON GRADE (SOG) PREPARATION 🔥

1. Subgrade Soil Condition
• Identify the type of soil (clay, sand, silt, gravel).
• Remove organic materials, roots, or soft soil.
• Replace weak soil with engineered fill or granular base.
• Expansive clay soils need stabilization (lime or cement treatment).
2. Moisture Content
• Soil must be at optimum moisture content (OMC) for proper compaction.
• Too dry → soil will not bind well.
• Too wet → soil becomes unstable or “pumping.”
• Water should be added or soil aerated before compaction.
3. Layer Thickness (Lift Thickness)
• Soil or gravel should be compacted in layers, not all at once.
• Typical lift thickness:
• 150–200 mm (6–8 inches) for soil
• 200–300 mm (8–12 inches) for granular fill
• Each layer must be compacted before adding the next.
4. Compaction Equipment
Choose equipment based on soil type:
Soil Type Recommended Equipment
Clay / cohesive soil Sheepsfoot roller
Sand / gravel Vibratory plate compactor or roller
Small areas Plate compactor or rammer
5. Compaction Standard
• Most building slabs require 95% compaction based on the Proctor Compaction Test.
• Field verification may use:
• Nuclear density test
• Sand cone test
6. Subbase or Base Course
Typical materials:
• Crushed gravel
• Crushed stone
• Base course
Functions:
• Improves drainage
• Distributes load
• Prevents capillary water rise.
Typical thickness: 100–150 mm (4–6 inches).
7. Drainage Considerations
• Ensure the site has proper slope and drainage.
• Standing water weakens compacted soil.
• Install perimeter drains or gravel layers if groundwater is high.
8. Proof Rolling
After compaction:
• A heavy roller or truck passes over the surface.
• If the soil deflects or pumps, it indicates weak spots that must be reworked.
9. V***r Barrier Installation
Before pouring concrete:
• Install polyethylene v***r barrier to prevent moisture from rising into the slab.
• Usually 6–10 mil plastic sheet.
10. Final Surface Leveling
• Ensure the base is level and well graded.
• No loose spots before placing reinforcement and concrete. TATAK QUALITY

Hiring for CEBU CITY PROJECTS ‼️
15/02/2026

Hiring for CEBU CITY PROJECTS ‼️

15/02/2026

🔥

Address

Liloan
6002

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 12pm

Website

Alerts

Be the first to know and let us send you an email when QPD Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to QPD Construction:

Share