Lee + Architects

Lee + Architects Address : 1979 Florentino Street, Sampaloc, Manila
Contact Number: 09063743791 (Globe) / 09694965732 (Smart)
Email: [email protected]

3-Units, 4-Storey Townhouse Project | Sampaloc, ManilaTotal Lot Area per unit: 50 sqmTotal Floor Area per unit: +/- 200 ...
26/08/2025

3-Units, 4-Storey Townhouse Project | Sampaloc, Manila
Total Lot Area per unit: 50 sqm
Total Floor Area per unit: +/- 200 sqm

Amenities:
1 - 1 Car Garage with Automatic Gate
2 - Service Kitchen (1 indoor and 1 outdoor)
1 - Utility Area with Water Pump and Tank
1 - Maids Room
1 - Living , Dining and Main Kitchen Area (w/ 2.5hp ACU)
2 - Common Toilet and Bath
3 - Bedroom with Toilet and Bath
1 - Masters Bedroom with Walk-In-Closet and Toilet and Bath (w/ 2.0hp ACU)

*All with Intercom and CCTV System

Scope of Works
- Detailed Architectural and Engineering Plans (DAEDS)
- General Construction

Partners:

Architectural Interiors Studio Unit Architectural Interiors | DMCI Homes Illumination ResidencesTotal Area: 30 +/- sqmSc...
02/05/2025

Architectural Interiors

Studio Unit Architectural Interiors | DMCI Homes Illumination Residences
Total Area: 30 +/- sqm

Scope of Works
- Architectural Interiors
-Architectural Plans and Joineries

Partners:

Architectural Interiors for  Garret Manila | Manila CityTotal Area: 350 +/- sqmScope of Works-Architectural Plans-CCTV a...
02/05/2025

Architectural Interiors for

Garret Manila | Manila City
Total Area: 350 +/- sqm

Scope of Works
-Architectural Plans
-CCTV and Audio System Layout
-Joineries

Project TurnoverGlassworks and Roll Up Door Supply and Installation | Manila CityScope of Works- 21 Sets of Aluminum Tem...
02/05/2025

Project Turnover

Glassworks and Roll Up Door Supply and Installation | Manila City

Scope of Works
- 21 Sets of Aluminum Tempered Glass Window
- 1 set of Tempered Glass Shower Enclosure
- 2 sets of Roll Up Door

Project Turnover with  Garret Manila Pool and Billiards | Manila CityTotal Area: 350 +/- sqmScope of Works-Carpentry Wor...
02/05/2025

Project Turnover with

Garret Manila Pool and Billiards | Manila City
Total Area: 350 +/- sqm

Scope of Works
-Carpentry Works
-Carpet Supply and Installation
-VIP Room with Acoustic and Sound Proofing
-Electrical Works
-Audio System
-Security System

Project TurnoverAssembly Hall Renovation | Manila CityTotal Area: 1500 +/- sqmScope of Works-Architectural Works-Acousti...
02/05/2025

Project Turnover

Assembly Hall Renovation | Manila City
Total Area: 1500 +/- sqm

Scope of Works
-Architectural Works
-Acoustic and Sound Proofing
-Electrical Works
-Electronics

Partner:

Assembly Hall Renovation | Manila CityTotal Area: 1500 +/- sqmScope of Works (September 2024) -Architectural Works-Acous...
05/10/2024

Assembly Hall Renovation | Manila City
Total Area: 1500 +/- sqm

Scope of Works (September 2024)
-Architectural Works
-Acoustic and Sound Proofing
-Electrical Works
-Electronics

Partner:

Various Works for Warehouse Renovation | Quezon CityTotal Area: 800 +/- sqmScope of Works (September 2024) -Architectura...
05/10/2024

Various Works for Warehouse Renovation | Quezon City
Total Area: 800 +/- sqm

Scope of Works (September 2024)
-Architectural Works
-Civil Works
-Electrical Works
-Plumbing and Fire Protection
-FDAS

Partner:

Vertical Garden, Davit Arm and Sail Shade System Project |Manila CityTotal Installtion Area: 700 +/- sqmProject Turnover...
05/10/2024

Vertical Garden, Davit Arm and Sail Shade System Project |Manila City
Total Installtion Area: 700 +/- sqm

Project Turnover (September 2024)
-Installation of Vertican Garden with Automatic Irrigation and Fertigation System
-Installation of Sail Shade System (One of the Largest in the Philippines)

Partner:

09/08/2024

Architecture Design for Full Renovation | Quezon City
Total Floor Area: 300 +/- sqm

- Exterior Perspectives

3-Unit, 3 Storey Residence with Roof Deck | Sampaloc, Manila CityTotal Floor Area: 500+/- sqmWeek 16-Structural Works (F...
08/08/2024

3-Unit, 3 Storey Residence with Roof Deck | Sampaloc, Manila City
Total Floor Area: 500+/- sqm

Week 16
-Structural Works (Foundation - Roof Deck)

Partner:

Office Renovation and Warehouse Construction |Manila CityTotal Floor Area: 140 +/- sqmWeeks 18-22 (May 2024)-Painting Wo...
07/08/2024

Office Renovation and Warehouse Construction |Manila City
Total Floor Area: 140 +/- sqm

Weeks 18-22 (May 2024)
-Painting Works
-Application of Powerfloor Epoxy Coating Flooring
-Installation of Acoustic Ceiling
-Electrical Works and Installation of Lighting Fixtures
-Punchlisting and Project Turnover

Address

Manila

Website

Alerts

Be the first to know and let us send you an email when Lee + Architects posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Lee + Architects:

Share