RCOB Construction

RCOB Construction Building quality homes & commercial spaces with integrity, precision and value. Design • Build • Project Management

𝗔𝗦 𝗕𝗨𝗜𝗟𝗧 𝗦𝗘𝗥𝗩𝗜𝗖𝗘𝗦As-Built services for the recently constructed 2-Storey Residential Building located at Pilar, Bataan. ...
25/03/2026

𝗔𝗦 𝗕𝗨𝗜𝗟𝗧 𝗦𝗘𝗥𝗩𝗜𝗖𝗘𝗦

As-Built services for the recently constructed 2-Storey Residential Building located at Pilar, Bataan.

Our scope includes accurate site verification, measurements, and preparation of as-built plans to reflect the actual condition of the structure—essential for permits, renovations, and future improvements.

We ensure that every detail is properly documented, aligned with actual site conditions and technical standards.

Thank you Ms. Torres for trusting RCOB Construction to prepare the as-built plans for your dream home 🙏

Let’s build smart. Let’s build right.


18/03/2026

🏗 Build with Confidence. Build with RCOB Construction.

Looking for a reliable partner for your project? We offer complete Construction & Engineering Services—from planning up to actual ex*****on.

✔ Residential & Commercial Construction
✔ Renovation & Fit-Out Works
✔ Warehouse & Industrial Projects
✔ Architectural & Engineering Design (Structural, Electrical, Sanitary, MEPFS)
✔ Plans, BOQ, and Cost Estimates
✔ Project Management & Site Supervision
✔ Ocular Visits & Technical Consultations

We combine practical site experience with technical expertise to deliver projects that are cost-efficient, well-planned, and built to standard.

📍 From concept to completion—we’ve got you covered.

📩 Send us a message and let’s start building your project the right way.

📌 Construction Trivia: What happens after site layouting?Kapag tapos na ang layouting at nailagay na ang gridlines sa si...
12/03/2026

📌 Construction Trivia: What happens after site layouting?

Kapag tapos na ang layouting at nailagay na ang gridlines sa site, the next step is excavation for footings — dito na hinuhukay ang foundation kung saan ilalagay ang base ng mga columns ng structure.

Ang location ng bawat hukay ay naka-align sa column grid system na nasa structural plans. Hindi ito basta tinatantya dahil ito ang magsisilbing foundation na magta-transfer ng structural loads ng building papunta sa lupa.

Ang lalim at sukat ng excavation ay naka-depende sa ilang engineering factors tulad ng:

• Structural load computation ng building
• Soil bearing capacity ng lupa sa site
• Footing size at column loads na naka-specify sa structural drawings
• Required embedment depth para maabot ang stable soil layer
• Spacing ng columns at footings base sa structural grid layout

Kaya sa professional construction practice, hindi basta hukay lang ang excavation. The site team checks alignment, elevation, at tamang dimensions ng footing bago maglagay ng rebars at bago ang concrete pouring.

🏗 Sa construction, strong buildings always start with the right foundation — from accurate plans to proper ex*****on on site.

Let’s build smart. Let’s build right. 🏗️


𝗠𝗘𝗣𝗙𝗦 𝗗𝗘𝗦𝗜𝗚𝗡Project MEPFS Design for the Office Fitout Renovation of V-Green Philippines located at BGC, Taguig City.Our...
10/03/2026

𝗠𝗘𝗣𝗙𝗦 𝗗𝗘𝗦𝗜𝗚𝗡

Project MEPFS Design for the Office Fitout Renovation of V-Green Philippines located at BGC, Taguig City.

Our team is committed to delivering well-coordinated engineering solutions that support the overall functionality and sustainability of the development.

Thank you V-Green Philippines for trusting RCOB Construction to be a part of building your office 🙏

Let’s build smart. Let’s build right.


𝗢𝗖𝗨𝗟𝗔𝗥 𝗦𝗜𝗧𝗘 𝗩𝗜𝗦𝗜𝗧 Ocular site visit for a prospect project - Proposed Renovation for a 2 Storey Cafe with 2 USAA Pickleb...
09/03/2026

𝗢𝗖𝗨𝗟𝗔𝗥 𝗦𝗜𝗧𝗘 𝗩𝗜𝗦𝗜𝗧

Ocular site visit for a prospect project - Proposed Renovation for a 2 Storey Cafe with 2 USAA Pickleball Courts located at Banker’s Village, Caloocan City.

Thank you Mr & Mrs Castillo for trusting RCOB Construction 🙏

Let’s build smart. Let’s build right.


📐 Before the digging starts, the layout must be right.Sa construction, hindi agad paghuhukay ang unang ginagawa. Layouti...
08/03/2026

📐 Before the digging starts, the layout must be right.

Sa construction, hindi agad paghuhukay ang unang ginagawa. Layouting muna ang pinakaunang critical step sa site.

Dito tinatama ang:
✔ Exact location ng poste at footing
✔ Building alignment at setbacks
✔ Grid lines ayon sa approved plans

Kapag mali ang layout, mali na ang buong structure — at mahal ang magiging correction.

Kaya sa bawat project, sinisigurado namin na accurate ang layout bago magsimula ang excavation. Precision at the start leads to quality construction.

— RCOB Construction

Let’s build smart. Let’s build right. 🏗️


𝗣𝗥𝗢𝗣𝗢𝗦𝗘𝗗 𝗗𝗘𝗦𝗜𝗚𝗡Proposed Design for the Renovation & Extension of a 2-Storey Residential Building. From assessment to det...
04/03/2026

𝗣𝗥𝗢𝗣𝗢𝗦𝗘𝗗 𝗗𝗘𝗦𝗜𝗚𝗡

Proposed Design for the Renovation & Extension of a 2-Storey Residential Building.

From assessment to detailed plans, we make sure every improvement is functional, structurally sound, and ready for proper permits.

Thank you Mr. & Mrs. Regis for trusting RCOB Construction to re-design your dream home 🙏

Let’s build smart. Let’s build right.


🗓️ Monday is Grind Day 🏗️Sa construction, ang Monday hindi lang start ng week — start ito ng hustle and planning ng buon...
02/03/2026

🗓️ Monday is Grind Day 🏗️

Sa construction, ang Monday hindi lang start ng week — start ito ng hustle and planning ng buong team.

Hindi lang ito basta pagcheck ng progress. This is a daily inspection to ensure na tama ang technical details na iniimplement onsite.

Because in our line of work, a small error can lead to a bigger problem tomorrow.

Teamwork, daily inspection, at consistency —
ito ang sikreto para ma-protect ang investment ng client at masigurong tama ang pagkakagawa.

Building isn’t just about “matapos agad”.
It’s about getting it right, every single day.

Let’s build smart. Let’s build right.


📌 CONSTRUCTION TRIVIA: Bakit kailangan ng Building Permit?Ang building permit ay hindi lang “requirement ng munisipyo.” ...
01/03/2026

📌 CONSTRUCTION TRIVIA: Bakit kailangan ng Building Permit?

Ang building permit ay hindi lang “requirement ng munisipyo.” Ito ay patunay na ang iyong plans ay na-review at compliant sa National Building Code, structural safety standards, at fire regulations.

🔎 Ano ang chine-check dito?
✔ Architectural layout
✔ Structural safety & load capacity
✔ Electrical load computation
✔ Plumbing & drainage system
✔ Zoning compliance



✅ Kapag May Permit:

• Legal ang construction
• Iwas penalty at demolition issues
• Mas secure ang investment
• Mas madaling makakuha ng occupancy permit

❌ Kapag Walang Permit:

• Risk ng Notice of Violation
• Possible penalties o pagpapahinto ng project
• Problema sa utilities at future resale

Tandaan: Mas mahal ang violation kaysa tamang proseso.

Let’s build smart. Let’s build right.


𝗦𝗜𝗧𝗘 𝗨𝗣𝗗𝗔𝗧𝗘 🏠Finishing Phase in progress - quality checking all the installed tiles, electrical components, painting fin...
28/02/2026

𝗦𝗜𝗧𝗘 𝗨𝗣𝗗𝗔𝗧𝗘 🏠

Finishing Phase in progress - quality checking all the installed tiles, electrical components, painting finishes and cleaning.

Thank you Sir George & Ma’am Marilyn for trusting RCOB Construction 🙏

Let’s build smart. Let’s build right.


📐🏗️ CONSTRUCTION DRAWINGS 101Ano-ano ba ang mga "drawings" or "plans" at bakit importante bawat isa?Kapag magpapagawa ng...
28/02/2026

📐🏗️ CONSTRUCTION DRAWINGS 101
Ano-ano ba ang mga "drawings" or "plans" at bakit importante bawat isa?

Kapag magpapagawa ng bahay, hindi lang isang drawing ang kailangan. May iba’t ibang plans na may kanya-kanyang purpose. Here’s a simple guide 👇

🔵 Architectural Plans
Focus: Space planning, aesthetics, and functionality

Typical contents:
✔ Floor plans with dimensions (complete measurements & layout)
✔ Elevations (exterior views with height references)
✔ Sections (cut views showing vertical relationships)
✔ Reflected Ceiling Plan (RCP)
✔ Door & Window Schedule
✔ Stair details
✔ Finish Schedule
✔ General Notes & Specifications

👉 This serves as the primary reference for layout, elevations, and architectural detailing.

🟠 Structural Plans
Focus: Load-bearing integrity and safety of the structure

Typical contents:
✔ Foundation Layout & Footing Details
✔ Column & Beam Layout
✔ Slab Reinforcement Details
✔ Roof Framing Plan
✔ Structural Sections & Connections
✔ Bar Bending Schedule (if applicable)
✔ Structural Notes & Design Criteria
✔ Signed & Sealed Structural Computations

👉 Ensures the building can safely carry dead loads, live loads, wind loads, and seismic forces.

🔴 Electrical Plans
Focus: Power distribution and lighting system

Typical contents:
✔ Lighting Layout with switching system
✔ Power Layout (outlets & dedicated circuits)
✔ Panel Board Schedule
✔ Load Computation
✔ Single Line Diagram
✔ Grounding Details
✔ Electrical Specifications

👉 Prevents overloading, ensures code compliance, and promotes electrical safety.

🟢 Plumbing / Sanitary Plans
Focus: Water supply and waste management system

Typical contents:
✔ Water Line Layout (cold & hot lines if applicable)
✔ Sanitary & Sewer Line Layout
✔ Isometric Diagrams
✔ Septic Tank Details
✔ Storm Drainage Layout
✔ Plumbing Computations
✔ Plumbing Specifications

👉 Proper planning prevents leaks, back flow issues, and drainage problems.

🟣 Mechanical Plans (if applicable)
Focus: HVAC and ventilation system

Typical contents:
✔ Air conditioning Layout
✔ Ducting System
✔ Equipment Schedule
✔ Ventilation Details

💡 Why are these important?
Because construction is not guesswork. Every line on the drawing has a purpose. Kapag kumpleto ang plans, mas smooth ang construction, less errors, and mas controlled ang budget. Iwas site conflicts, delays and additional costs.

✔ Complete Plans
✔ Signed & Sealed by Licensed Professionals
✔ Approved for Permit

That’s how you build properly — not by guesswork, but by system and design.

Build Smart. Start with the right plans. 🏠

𝗢𝗖𝗨𝗟𝗔𝗥 𝗦𝗜𝗧𝗘 𝗩𝗜𝗦𝗜𝗧 🏠Ocular site visit for a renovation & extension project located at Phirst Park Homes, Baliwag, Bulacan...
28/02/2026

𝗢𝗖𝗨𝗟𝗔𝗥 𝗦𝗜𝗧𝗘 𝗩𝗜𝗦𝗜𝗧 🏠

Ocular site visit for a renovation & extension project located at Phirst Park Homes, Baliwag, Bulacan.

Thank you Sir Rob for trusting RCOB Construction 🙏

Let’s build smart. Let’s build right.


Address

Vitalez Compound, Brgy. San Isidro, Sucat
Parañaque
1700

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm
Friday 7am - 6pm
Saturday 7am - 6pm
Sunday 7am - 6pm

Telephone

+639165564598

Website

Alerts

Be the first to know and let us send you an email when RCOB Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to RCOB Construction:

Share