SJ RAHON DESIGN AND BUILDERS

SJ RAHON DESIGN AND BUILDERS Design and construction specializing in geotechnical and foundation engineering.

27/08/2026
We are updating our project map to showcase our experience in soil testing/soil boring/ geotechnical investigations. Ple...
24/06/2026

We are updating our project map to showcase our experience in soil testing/soil boring/ geotechnical investigations. Please click the link below to view the partial locations of our completed geotechnical investigation projects. For your soil testing requirements, please call 09688849315.

SJRAHON SOILTEST

16/06/2026
16/06/2026
15/06/2026

Geotechnical Report Content as per NSCP 2015
1. Site Exploration Plan
β€’ Plot showing all test borings (SPT, CPT, auger, rotary wash) and in-situ tests (CPT, DCP, vane shear, PMT, plate load)
β€’ Trial pits/excavations
β€’ Locations of structures, utilities, site features
β€’ Ground elevations, benchmarks, and coordinates/gridlines for exploration points
πŸͺ¨ 2. Subsurface Materials & Classification
β€’ Soil/rock layers with USCS classification
β€’ Key index properties (Atterberg limits, grain size, moisture content)
β€’ Visual/manual notes
β€’ Identification of fill, natural soils, problematic soils (e.g., expansive, soft clays), and bedrock/weathered rock
πŸ’§ 3. Groundwater Conditions
β€’ Water table elevation (if found) and measurement method
β€’ Observed seepage or perched water
β€’ Seasonal variation expectations
β€’ Impact on excavation, stability, and foundation design
πŸ—οΈ 4. Foundation Recommendations & Design Criteria
4.1 Recommended Foundation Type
β€’ Shallow foundations (spread footings, mat foundations)
β€’ Deep foundations (driven piles, bored piles, Micropiles)
β€’ Ground improvement options (if required)
4.2 Bearing Capacity
β€’ Allowable bearing pressures
β€’ Basis of evaluation (SPT N, CPT qc, lab tests, correlations)
β€’ Shear controlled vs settlement-controlled capacities
4.3 Differential Settlement Mitigation
β€’ Footing sizing and proportioning
β€’ Raft foundation considerations
β€’ Preloading, surcharging, or staged construction
β€’ Avoidance of abrupt layer transitions
4.4 Liquefaction & Strength Loss
β€’ Liquefaction triggering analysis
β€’ Factor of safety against liquefaction
β€’ Recommended mitigation:
β€’ Densification
β€’ Stone columns
β€’ Deep soil mixing
β€’ Pile foundations bypassing liquefiable layers
4.5 Special Foundation Solutions
β€’ Underpinning
β€’ Retaining structures
β€’ Excavation support systems
β€’ Dewatering requirements
4.6 Effects on Adjacent Structures
β€’ Predicted ground movements
β€’ Vibration impacts (pile driving, compaction)
β€’ Protection measures for nearby buildings and utilities
πŸ“‰ 5. Estimated Total and Differential Settlement
β€’ Immediate settlement
β€’ Consolidation settlement
β€’ Secondary compression (if applicable)
β€’ Differential settlement across footings or mat foundations
β€’ Time rate of settlement (t50, t90)
πŸ§ͺ 6. Laboratory Test Results
β€’ Moisture content
β€’ Atterberg limits
β€’ Grain size distribution
β€’ Unit weight
β€’ Consolidation test results
β€’ Direct shear / triaxial test results
β€’ Unconfined compression (if applicable)
β€’ Chemical tests (sulfates, chlorides, pH) when relevant
πŸ“ 7. Field Borehole Logs
β€’ Drilling method and equipment
β€’ Depth wise soil description
β€’ SPT N values (with corrections if applicable)
β€’ Groundwater observations
β€’ Sampling intervals and sample types
β€’ Rock core recovery (RQD, % recovery)
β€’ Notes on refusal, obstructions, or anomalies

Send a message to learn more

Big thanks to Ryan Joseph Apallafor all your support! Congrats for being top fans on a streak πŸ”₯!
28/02/2026

Big thanks to Ryan Joseph Apalla

for all your support! Congrats for being top fans on a streak πŸ”₯!

28/01/2026

πŸ“˜ Geotechnical Report Content (Part 1 of 2)
(per NSCP 2015 Requirements)
πŸ—ΊοΈ 1. Site Exploration Plan
β€’ Plot showing all test borings (SPT, CPT, auger, rotary wash) and in-situ tests (CPT, DCP, vane shear, PMT, plate load)
β€’ Trial pits/excavations
β€’ Locations of structures, utilities, site features
β€’ Ground elevations, benchmarks, and coordinates/gridlines for exploration points
πŸͺ¨ 2. Subsurface Materials & Classification
β€’ Soil/rock layers with USCS classification
β€’ Key index properties (Atterberg limits, grain size, moisture content)
β€’ Visual/manual notes
β€’ Identification of fill, natural soils, problematic soils (e.g., expansive, soft clays), and bedrock/weathered rock
πŸ’§ 3. Groundwater Conditions
β€’ Water table elevation (if found) and measurement method
β€’ Observed seepage or perched water
β€’ Seasonal variation expectations
β€’ Impact on excavation, stability, and foundation design
For your soil boring/geotechnical investigation, please call us at 09688849315

Address

Pascua Street
Pinili

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when SJ RAHON DESIGN AND BUILDERS posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to SJ RAHON DESIGN AND BUILDERS:

Share