JH Electrical + Solar

JH Electrical + Solar Electrical Engr.
✅Reg. Master Electrician
✅TESDA PV NC II
(2)

Labor Solar Installation
Electrical Installation
Solar & Electrical Design
Testing & Commissioning
Troubleshooting
Solar & Electrical Maintenance
Project Collaboration
Consultancy

✅Reg.

One of the advantages of net metering during the raining season is that even when solar production is very low, you can ...
25/08/2026

One of the advantages of net metering during the raining season is that even when solar production is very low, you can use your previously accumulated credits from the summer months and still enjoy a “ZERO bill”.

Para kang may deposit na pera sa bangko na magagamit mo in times of crisis 😅.

25/08/2026
25/08/2026
10kW Grid-Tie Solar PV System with Net Metering - (Labor Installation)Location: Quezon City-Net Metering process by Clie...
24/08/2026

10kW Grid-Tie Solar PV System with Net Metering - (Labor Installation)

Location: Quezon City

-Net Metering process by Client
-No REC Meter
-CT Rated Service Entrance
-Service Entrance Modification by Master Jhun Aguil (Meralco Accredited Contractor)

For inquiries:

Engr. Jake
📍CONTACT #: 09217863566
📍VIBER: 09092505394
📍WHATS APP: 09092505394
📍EMAIL ADD.: [email protected]

Good luck sa mga installer na nawala yung proof of purchase pano ngayon mag ki claim ng warranty😅. Tapos yung mga bumili...
22/08/2026

Good luck sa mga installer na nawala yung proof of purchase pano ngayon mag ki claim ng warranty😅. Tapos yung mga bumili sa mga reseller 😅.

SERVICE CENTER ADVISORY

Effective August 24, 2026 (Monday), all warranty units must be accompanied by a valid Proof of Purchase.

Warranty units without Proof of Purchase will no longer be accepted.

If your Proof of Purchase has been lost, please coordinate with your seller to obtain an Acknowledgment Letter confirming the purchase of the inverter, including the date of transaction.

REQUIRED INFORMATION UPON RECEIVING THE UNIT:

• Client Name
• Phone Number
• Email Address
• Complete Address
• Distributor
• Model Name
• Serial Number
• Inverter/Battery Issue

Please ensure that all required information and documents are complete before submitting your unit for warranty service.

Thank you for your cooperation and understanding.




Take the opportunity for free scholarship. I finished this course way back in 2022.
21/08/2026

Take the opportunity for free scholarship.

I finished this course way back in 2022.

𝐑𝐞𝐠𝐢𝐨𝐧𝐚𝐥 𝐓𝐫𝐚𝐢𝐧𝐢𝐧𝐠 𝐂𝐞𝐧𝐭𝐞𝐫 – 𝐍𝐂𝐑 | 𝐄𝐍𝐑𝐎𝐋𝐋𝐌𝐄𝐍𝐓 𝐔𝐏𝐃𝐀𝐓𝐄

Enrollment application is now OPEN for the following training program:

𝐂𝐨𝐮𝐫𝐬𝐞 𝐓𝐢𝐭𝐥𝐞: PV Systems Installation NC II
𝐃𝐮𝐫𝐚𝐭𝐢𝐨𝐧: 39 Days (10 Days Online + 29 Days Face to Face)
𝐌𝐨𝐝𝐚𝐥𝐢𝐭𝐲: Blended Training
𝐒𝐜𝐡𝐨𝐥𝐚𝐫𝐬𝐡𝐢𝐩: TESDA Special Training for Employment Program
𝐓𝐚𝐫𝐠𝐞𝐭 𝐒𝐭𝐚𝐫𝐭 𝐃𝐚𝐭𝐞: September 01, 2026

𝐄𝐧𝐭𝐫𝐲 𝐑𝐞𝐪𝐮𝐢𝐫𝐞𝐦𝐞𝐧𝐭𝐬:
- Must have a Certificate of Indigency
- Can communicate both orally and in written
- Physically and mentally fit to undergo training
- At least 18 years old

For the complete list of documentary requirements, please refer to the official enrollment poster.

📍 Bldg. 14, Gate 2, TESDA Complex, East Service Rd., SLEX, Taguig City
📧 [email protected]
📱 0968-852-8204
🕗 Office Hours: Monday to Thursday | 8:00 AM – 7:00 PM

Please note: All applicants are subject to screening, entrance examination, and verification of the required entry requirements. Submission of an application does not guarantee admission.

Address

Taguig
1637

Website

Alerts

Be the first to know and let us send you an email when JH Electrical + Solar posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JH Electrical + Solar:

Shortcuts

Share