03/08/2026
Proposed Municipal Sanitary Landfill in Bataan (Category II)
✅ Preliminary Engineering Design of Sanitary Landfill
✅ Waste Retaining Facility
✅ Stormwater Drainage Facility
✅ Liner Facility
✅ Leachate Collection Facility
✅ Gas Venting Facility
✅ Leachate Treatment Facility
✅ Material Recovery Facility (MRF)
✅ Other Related Facilities
--------------------------------------------------------------------------
Thank you Ma'am
for trusting us.
--------------------------------------------------------------------------
📍 Nationwide services
📞 0927-3355-169
📩 [email protected]
--------------------------------------------------------------------------
🔴BUILDING PERMIT APPLICATION ASSISTANCE
🏠Building Permit
🏠Occupancy Permit
🏠Development Permit
🏠As-Built Plan/Drawing
--------------------------------------------------------------------------
⚫ENGINEERING DESIGN & CONSULTANCY
⚙️Structural
⚙️Plumbing
⚙️Electrical
⚙️Sanitary
--------------------------------------------------------------------------
🟢ENVIRONMENTAL COMPLIANCE CONSULTANCY (DENR/LLDA)
♻️Environmental Compliance Certificate (ECC)
♻️Certificate of Non-Coverage (CNC)
♻️Wastewater Discharge Permit Application (WWDP)
♻️Wastewater Treatment Facility (WWTF/STP)
--------------------------------------------------------------------------
🔵 DIGITAL BLUEPRINTING
📇20"x30" BLUEPRINT
📇A1 SIZE BLUEPRINT
📇20"x30" WHITE PAPER
📇A1 SIZE WHITE PAPER
📇A3 SIZE WHITE PRINT
📇20"x30" TRACING PAPER
📇A1 SIZE TRACING PAPER
--------------------------------------------------------------------------
--------------------------------------------------------------------------
For every house is built by someone, but the builder of all things is God. (Hebrews 3:4)
For from him and through him and to him are all things. To him be glory forever. Amen (Romans 11:36)
Blessing and glory and wisdom and thanksgiving and honor and power and might be to our God forever and ever (Rev. 7:12)