The Following Documents are Required for Building Plan Approval from TMA, Abbottabad

For Residential Buildings:

1. One map copy on tracing cloth.
2. Seven copies of sample paper (standard size).
3. Owner's CNIC copies.
4. Site photo.
5. Site GPS coordinates.
6. Fresh fard (not older than 30 days).
7. Bank challan copy of fard.
8. Registry (verified from Tehsildar) within 30 days.
9. Non-Encumbrance Certificate (NEC) from Tehsildar.
10. Aks Shajra.
11. Application form (Form-1).
12. Architect's Engineer Certificate (Form-2).
13. Structure Engineer Certificate (Form-6).
14. For Existing Building approval (Form-7).
15. Affidavit on stamp paper (Form-9).
16. Application form for land use permission.

For Commercial Buildings:

Serial No. 1-16 are compulsory.

17. Structure drawing (up to 3-story building).
18. Soil Test Report.
19. Structure Stability Certificate.

Note:
Only building plans designed under the Khyber Pakhtunkhwa Building Control Regulation 2024 will be accepted.

This message has been issued for the convenience of the public.
Planning Control Inspector: Imran Khan.

17/07/2025
New project of 24 marla.Architect Nadeem Khalil Khalil construction company
07/02/2025

New project of 24 marla.
Architect Nadeem Khalil




Khalil construction company


06/12/2024
26/08/2024

Building on sloped site

Address

House Number , 2 Near Muslim Academy School, Tehsil Lora, District Abbottabad
Abbottabad
22360

Website

Alerts

Be the first to know and let us send you an email when Khalil construction company posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share