10/02/2026
A successful site visit was conducted at Tower No. 405 of the Dassu–Mansehra Transmission Line by the Project Manager (Sinohydro), along with the Country Head, NHC CEO Mr. Sheikh Abdul Wahab, DPM Mr. Rizwan, Mr. Aamir Niaz, and the NHC team.