01/01/2026
Glorious Tech successfully completed the construction of a 600-foot long road surrounding a 12,000 sq ft area, featuring pavers installation, infrastructure, communication underground cable ducts, electric pole installation, and limiter gates at both entrances, along with paint work, as evidenced by the step-by-step photos and videos showcasing the transformation of the previously neglected and damaged road into a newly developed infrastructure.