Power & Control Engineering Holding

Power & Control Engineering Holding State-of-the-art Products, Solutions, Integration and Services covering all the major branches of engineering and technology from one platform.

Group photo session with NCC managers after successfull completion of 132kV OHTL 380/132kV S/S Al Madaya to 132/13.8 kV ...
11/11/2016

Group photo session with NCC managers after successfull completion of 132kV OHTL 380/132kV S/S Al Madaya to 132/13.8 kV S/S AL HISMA.

On behalf of PACE HOLDING team,  I wish Happy National Day to the people of Saudi Arabia. اليوم الوطني مبروك للمملكة الع...
23/09/2016

On behalf of PACE HOLDING team, I wish Happy National Day to the people of Saudi Arabia.
اليوم الوطني مبروك للمملكة العربية السعودية .

PROJECT:132kV OHTL AL MADAYA TO HISMA S/S Site meeting and inspection with NCC General Manager K.Gopal and Sr.Manager Ch...
18/09/2016

PROJECT:132kV OHTL AL MADAYA TO HISMA S/S Site meeting and inspection with NCC General Manager K.Gopal and Sr.Manager Chocklingam

Joint Tool box meeting with NCC at 132kV OHTL AL MADYA TO HISMA S/s
15/09/2016

Joint Tool box meeting with NCC at 132kV OHTL AL MADYA TO HISMA S/s

Final sagging and dead ending is in progress for 132kV OHTL Al madya to hisma s/s abu arish jazan.
15/09/2016

Final sagging and dead ending is in progress for 132kV OHTL Al madya to hisma s/s abu arish jazan.

132kV OHTL D/C from Al Madaya 380/132kV S/S to Al Hisma 132kV S/S Twin conductor per phase, conductor pulling has been s...
27/07/2016

132kV OHTL D/C from Al Madaya 380/132kV S/S to Al Hisma 132kV S/S Twin conductor per phase, conductor pulling has been started today. Before stringing safety meeting and praying session was held to avoid any accident as well as incident.

05/07/2016

A beautiful safety message. 😃

So finally the helmets, heavy shoes and yellow jacket are off. 132 KV SEC SS completed. Final touches being given. Thank...
21/05/2016

So finally the helmets, heavy shoes and yellow jacket are off. 132 KV SEC SS completed. Final touches being given. Thanks to the expert and efficient team of PACE Holding. In the back ground 40 MVA 132/13.8 KV Transformer.

Riyadh Metro...
27/04/2016

Riyadh Metro...

Address

Riyadh
50062

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Sunday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Power & Control Engineering Holding posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Power & Control Engineering Holding:

Share

Category