MOMO Development

MOMO Development MOMO offers a wide range of container houses, swimming pools and other modular objects.

Building houses is our job, but building relationships with you is our real passion. Thank you for being part of our jou...
24/12/2025

Building houses is our job, but building relationships with you is our real passion. Thank you for being part of our journey this year. We hope your holidays are filled with love, laughter, and meaningful moments. 🎄✨

Last weekend, we finally had a moment to slow down and meet as a team in Warsaw 😊There were a few good reasons for it. W...
23/12/2025

Last weekend, we finally had a moment to slow down and meet as a team in Warsaw 😊

There were a few good reasons for it. We closed 2025, celebrated 5 years of MOMO 🎉, and took a proper look at the projects we’ve delivered so far. What worked, what didn’t, and what we want to do better next time. Honest conversations and real takeaways.

We also spent time developing our Ideal Project concept and built a complete process to guide how we work in 2026.

And yes, it was also our Christmas get-together 🎄 Good food, long talks, a bit of laughter, and time to be together outside of deadlines and meetings.

Huge thanks to the team. The way you show up and work together really matters 🙌

Willing to launch your retail business in days, not months?Check our fully prefabricated, turn-key modular building, dev...
17/10/2025

Willing to launch your retail business in days, not months?

Check our fully prefabricated, turn-key modular building, developed in collaboration with our technology partners at HonestBox and delivered to Sorunda, Sweden 🚀

This approach enabled our client, Sunnerby Livs, to move from delivery to a fully operational store within just a few days, providing a crucial advantage in accelerating business launch and ROI.

Again, this is another great example of how modular construction provides immediate, high-quality objects 🙌

Key elements of the solution:

• A complete building delivered to a turn-key standard and tailored to Swedish requirements.
• Fully equipped with the HonestBox automatic access system for seamless self-service operation.
• Built on a durable welded steel frame with a reinforced floor for longevity.
• Customizable finishing materials and colour schemes to match the client's brand identity.
• Efficient heating and cooling provided by an integrated air-to-air heat pump.
• Designed, produced, and delivered in just 6-8 weeks after final design approval.

We are extremely happy to help another business launch faster. Visit Sunnerby Livs’ Instagram page for more visuals (link in the comments below).

24/06/2025

The underwater test facility at KTH Royal Institute of Technology has now been fully operational for a month

Check out this time-lapse video that captures three weeks of progress, starting from an empty space and ending with a fully equipped high-tech underwater laboratory 🙌

In the final scenes, AUV-SAM can be seen navigating through hula hoops while being tracked in real time by an advanced motion capture system.

Our latest custom sauna is ready for delivery to southern PortugalBuilt on a 20HC container base, this modular unit was ...
12/06/2025

Our latest custom sauna is ready for delivery to southern Portugal

Built on a 20HC container base, this modular unit was tailored to our client’s vision and built to perform.

It’s a space designed for comfort, experience, and year-round usability, with clean design and high-end finishes.

Key elements:
• interior finished with white aspen wood
• Harvia 9kW electric heater
• outdoor shower
• built-in AC with heating function
• double-glazed sliding window at the front
• fully glazed internal wall leading to the sauna

Another project delivered. Another reason we love modular ❤

And how do you like it? 🤗 Following our assembly at the end of May and Paraply's final touches, the facility already wel...
05/06/2025

And how do you like it? 🤗

Following our assembly at the end of May and Paraply's final touches, the facility already welcomes guests attending the Sweden Rock Festival.

Following our assembly at the end of May and Paraply's final touches, the facility welcomes guests attending the Sweden Rock Festival.

What do you do when a school needs a new building in just 90 days?Most say it can’t be done. We proved otherwise.The mun...
21/05/2025

What do you do when a school needs a new building in just 90 days?

Most say it can’t be done. We proved otherwise.

The municipality of Hoeven in the Netherlands recently faced a serious challenge: deliver a fully functional, 2-story school building with classrooms, a kitchen, and sanitary facilities in only three months.

We responded with precise modular construction:
• 12 steel-framed modules
• Designed and built in our Polish facility
• Engineered to meet Dutch building regulations
• Delivered on 7 trucks
• Installed in just 12 hours

Two days later, it was ready for students. Fully compliant. Completely equipped ✨

This project is proof of what’s possible when speed meets quality. And a strong example of how modular innovation delivers results in the public sector.

If your next project has a tight deadline, we’re ready to turn it from idea to reality.

Let’s talk.

What will our cities look like in 10, 20, or 30 years?That was one of the key questions raised at Synergy in Architectur...
14/04/2025

What will our cities look like in 10, 20, or 30 years?

That was one of the key questions raised at Synergy in Architecture 2025, hosted by Lublin University of Technology (Politechnika Lubelska).

We were there as sponsors - and as listeners.

➡ This year’s theme focused on the relationship between metropolitan areas and satellite cities.
Urban planning, sustainability, technology.
Plenty of insights and diverse perspectives.

During the event, our CTO Martin Ojrzynski gave a short presentation about MOMO’s projects and our approach to modular construction.

Big thanks to the organizers and all the participants for the inspiring conversations.

See you next time!

We’re excited to share that we are now a sponsor of the 3rd International Scientific Conference Synergy in Architecture:...
25/03/2025

We’re excited to share that we are now a sponsor of the 3rd International Scientific Conference Synergy in Architecture: Metropolitan Districts with Satellite Cities at Lublin University of Technology (Politechnika Lubelska)!

The event takes place on April 10 at the Faculty of Civil Engineering and Architecture.

Adding to the excitement, our CTO and Managing Director, Martin Ojrzynski, will take the stage to deliver a presentation.

We look forward to seeing you there!

Another project completed for one of our regular clients 🇸🇪. The visualization and the final result are nearly identical...
05/03/2025

Another project completed for one of our regular clients 🇸🇪. The visualization and the final result are nearly identical!

A compact sales kiosk built from a 10-foot container, featuring a high-quality plywood finish inside.

We love this type of finishing material! What do you think?

One of our completed projects from last year for a Swedish electric truck charging network operator.A 60m² lounge built ...
19/02/2025

One of our completed projects from last year for a Swedish electric truck charging network operator.

A 60m² lounge built from two modules, designed to meet all functional requirements for this type of facility. It includes toilets, a shower, a service room, a server room, and an office space.

We are expanding our offer with mobile pavilions, available in various sizes and finishing standards. They provide one o...
03/02/2025

We are expanding our offer with mobile pavilions, available in various sizes and finishing standards. They provide one of the most affordable and fastest solutions for launching your own business. It's perfect for a store, office, or beauty salon.

Optional features include:
✅ Air conditioning
✅ Automated access (HonestBox)
✅ Restroom
✅ Customizable windows, doors, and colors

The presented model (12.0m x 3.0m) will soon be delivered to Sweden, where it will operate as a self-service store equipped with HonestBox technology. More updates and photos coming soon!

Adress

Siktgatan
Gamla Stan
16212

Aviseringar

Var den första att veta och låt oss skicka ett mail när MOMO Development postar nyheter och kampanjer. Din e-postadress kommer inte att användas för något annat ändamål, och du kan när som helst avbryta prenumerationen.

Dela