Our second project in Bangkok, Thailand. Pool Sculpture, Aestiq Thonglor. The main challenge was to rationalize freeform geometry with quadrilateral mesh as received from the facade contractor. Our role is to ensure that all the subdivisions are coplanar surfaces or minimum tolerances (+/-3mm) to avoid the use of double curved stainless steel sheet. The benefits are as follows:
1. Maintain the original architectural design intent on a smooth surface.
2. As no need double curved sheet, the cost is affordable.
3. Facilitate the design and engineering works.
4. Easier to fabricate and installation.
Thus, the project is able to construct.