23/10/2026
BAD SAAROW DENTAL CLINIC, GERMANY
From drawings to reality — a look inside our dental clinic project in progress.
Located in a new three-story building in Bad Saarow, the clinic will occupy the first two floors, with apartments above.
At this stage, the layout is becoming visible, walls are in place, and electrical systems, ventilation, air conditioning and plumbing are being installed. It’s also the moment when on-site coordination becomes essential.
During site visits, we check every detail against the design: from lighting positions and ceiling details to technical systems, furniture and medical equipment. The goal is to make sure that every element works together — both technically and visually.
There’s still a long way to go, but the project is gradually taking shape.
Follow WOW Project to see how the space evolves.