An 88’ x 60’ sports court completed today for Arts Projects in Byron Center. This project required extensive site preparation, including the relocation of a significant amount of soil, and more than 250 yards of sand. All fill material was placed and compacted in 6” lifts to ensure proper density and long-term stability of the slab.
Our crews had three skid steers and multiple dump trucks operating continuously for a full day to keep the project on schedule. The court carries approximately 11” of fall from one end to the other to ensure proper drainage. Due to the existing grade conditions, the north side of the slab sits roughly 4’ below surrounding grade, while the south side is approximately 5’ above grade. Future phases of the project include the construction of a retaining wall along the north side and complete regrading and reshaping of the south yard area.
Another large-scale project completed with a strong focus on preparation, compaction, drainage, and long-term performance.