Most crews don’t catch this until framing grinds to a halt. Wall framing starts strong but then subs call out clashes,duct chase bumping into beam pockets nobody caught in the plans.
RFIs pile up quick, superintendent scrambling with no clear answers. Sketches taped to studs become the daily workaround just to keep things moving.
An inspector spots a code miss and now permitting wants changes right in the middle of the schedule push. The original permitted drawings looked solid but mechanical and structural never got coordinated before crews showed up.
This isn’t just one job , happens way more than we admit when drafting shortcuts meet tight timelines. Field ends paying in delays and change orders that blow budget wide open.
Which detail or trade usually catches these conflicts first on your sites? Book a consultation: