Most crews don’t catch this until lumber shows up on site. By the time framing starts, beams and posts are already ordered but no one notices a misaligned load path until something doesn’t line up with what’s drawn on paper.
Superintendents start checking twice, then field sketches hit desks and phones ring off the hook. Crews lose hours waiting for decisions.
Schedules begin slipping way behind. Sometimes it’s just a header tweak, other times it’s shifting an entire wall.
Framing turns into guesswork for subs trying to work around the mess. RFIs start piling up fast.
Change orders come next. Inspectors want clarifications right after framing goes in.
All that time and money leaks out through patch jobs and delays. This always tracks back to missing coordination before permits go out,one small detail skipped or lines not checked against structural plans turns into chaos once on site.
Most get caught if plans are coordinated properly before lumber is ordered,but too often it’s on field teams to fix last minute. Where do these load path misses usually get caught on your projects?