10/20/2026
Phase 1: This homeowner in Bartlett was experiencing some surface water washing down the side of his new workshop. We installed an 18” catch basin with a 6” pvc discharge line out to a pop up. We were working with a budget since they had just spent so much for his workshop but it will make a huge impact for the amount of water that was flowing through this area. If you know anyone that is experiencing washout along any structure think of me and call D&G.