11:03 in the morning this was a round hole in a block wall. By 5:25 that evening, the ring was up — the masons were back the next morning for the final touches.
The keystone goes in first — the piece at the top that everything else leans on. Then the masons work their way around the circle, one straight-edged stone at a time, each one cut so the joints point back to the center. No template, no form. Just a level, a string line, and a crew that has done this before.
Pool house at Cleveland Forest Retreat, Greenville SC.
Stone by Steep Creek Stoneworks with the Villegas crew.
Follow along — the slate roof went on the same day. Have you ever watched a round window get built?