06/02/2026
Before Seattle's Link Light Rail connected communities across the region, there was C700.
As the first section of Sound Transit's Central Link project, C700 helped lay the foundation for the modern Seattle Light Rail system that thousands of riders depend on every day.
For Shaun, this project was more than post-tensioning and structural concrete—it was where he learned from industry veterans, worked alongside the brothers and sisters of Ironworkers Local 86, and witnessed firsthand how great engineering from Huitt-Zollars and exceptional ex*****on by Kiewit Pacific come together to build lasting infrastructure.
More than twenty years later, those lessons still influence the work we do today.
From post-tensioning systems and structural engineering to infrastructure repair and forensic investigations, every project teaches something worth carrying forward.
We recently shared the full story behind C700, Seattle's first mile of light rail.
🔗 Read the full article through this link: https://tinyurl.com/posttensioningsolutions