Relyt Construction LLC

Relyt Construction LLC Servicing the Back Mountain, Wyoming Valley and beyond. Serving Northeast PA. Back Mountain, Wyoming Valley and surrounding areas.

General Contractor-
From Bathroom and Kitchen Renovations to Electrician Services and Decks, we handle each project personally and one at a time with no subcontracting. Kitchens and Bathrooms, Decks, Electrical, Plumbing, Framing, Drywall, Tile, Flooring, Windows/Doors, And Much More...
* Licensed & Insured *

[email protected]

Spring Break Bathroom renovationGutted, removed doorway and soffit, New tub, tile surround with niche and champagne fauc...
04/06/2026

Spring Break Bathroom renovation
Gutted, removed doorway and soffit, New tub, tile surround with niche and champagne faucet. New tile floor on diagonal, new electric including bluetooth light/vent, double vanity with linen cabinet and paint.

Valentine's Bathroom RemodelDemo including removing soffit, Level and new sub floor, New tub with Delta mixer and Custom...
02/13/2026

Valentine's Bathroom Remodel
Demo including removing soffit, Level and new sub floor, New tub with Delta mixer and Custom subway tiling with niche and corners, New lighting, Flooring, Vanity, Toilet, doors, moldings and Paint.

Time again for our reminder on Freezing pipes:To prevent:1. trickle faucet to keep a small flow through cold temps2. ins...
02/08/2026

Time again for our reminder on Freezing pipes:

To prevent:
1. trickle faucet to keep a small flow through cold temps
2. insulate pipe, try to keep pipe on the "warm side of wall" and insulate on cold side.
3. Install heat tape to pipe. Have tape ride along pipe, not spiral around and never overlap.
4. Install heater on low 3 ft away from potentially frozen pipe

To thaw safely, here are a few methods....
(*its not advised to use open flame like a propane torch on frozen piping)

1. Open faucet that is frozen. Then work backwards from faucet to frozen section with hair dryer or heat gun. this will allow any v***r to escape and avoid a pipe burst * never hold heat source on one section of pipe longer than a few seconds*
2. open faucet, Wrap warm towels around frozen pipe every 5 minutes until thawed.
3. open faucet, Put heater 3 ft away from pipe on low until thawed

Elegant "Sharpe" Bathroom RenovationGutted, Drywall work, New LED lighting, ShipLap, Replumb, Hex tile floor, custom Sub...
11/08/2025

Elegant "Sharpe" Bathroom Renovation
Gutted, Drywall work, New LED lighting, ShipLap, Replumb, Hex tile floor, custom Subway shower tile with niche, bench Delta Faucet, Rainhead and Glass. New vanity, toilet and accessories.

Fresh Timeless Bathroom UpdateInstalled new tub, Marbled tile surround, carrera corner shelves, Delta faucet, led recess...
10/10/2025

Fresh Timeless Bathroom Update
Installed new tub, Marbled tile surround, carrera corner shelves, Delta faucet, led recessed lights, vinyl plank floor, moldings, paint, toilet, 55" double vanity and accessories.

Bold Elegant Bathroom RemodelRemoved wall to build angle, removed extra entry door, new lighting, black paint, black hex...
09/10/2025

Bold Elegant Bathroom Remodel
Removed wall to build angle, removed extra entry door, new lighting, black paint, black hex tile with jet black grout, black Kohler toilet, modern black sink with floor faucet, backlight mirror, and modern chandelier

Summer Cabana Build.
08/13/2025

Summer Cabana Build.

Crisp Bathroom RenoInstalled bathtub with gloss tile surround, Delta faucets, stonecore floor, a heavy vanity, toilet, v...
07/30/2025

Crisp Bathroom Reno
Installed bathtub with gloss tile surround, Delta faucets, stonecore floor, a heavy vanity, toilet, vent/light, paint etc..

05/29/2025

📢 Schedule opening 🚨
Due to circumstances out of our control, there has been an opening in the upcoming schedule.
Perfect time to get that project done.
Call, text, message or email

Spring Bathtub to Tile Shower conversion. Remove tub, surround, tile floor, vanity etc..Install Wedi shower system with ...
04/28/2025

Spring Bathtub to Tile Shower conversion.
Remove tub, surround, tile floor, vanity etc..
Install Wedi shower system with matte black delta faucet, Tile with recessed niche and foot rest. Installed shower door, flooring, vanity toilet and paint.

Valentine's Day BathroomFull Gut, partial reframe, Wiring including led lighting, Plumbing, Drywall, added double vanity...
02/13/2025

Valentine's Day Bathroom
Full Gut, partial reframe, Wiring including led lighting, Plumbing, Drywall, added double vanity, Black just about everything, Custom shower including 15x30 tile, deep tub, medicine cabinets, and of course a Pocket Door.

Merry Christmas and Happy New Year!
12/24/2024

Merry Christmas and Happy New Year!

Address

Bunker Hill RD
Back Mountain, PA
18644

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Relyt Construction LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Relyt Construction LLC:

Share