04/22/2026
This was a project from the end of last September/ beginning of October. Customer needed lots of dirt to make the grade around the house. So we dug a pond and used the remaining dirt to grade around the house and walkout basement. The back and sides of the pond needed brought up about 4-5ft to match the elevation. A core trench was dug, and layers were compacted with a sheep's foot roller. Construction was completed first week of October, most recent pond picture was a little over a week ago. It may be full yet this year.