02/06/2026
UPDATE on last night’s emergency call ⚡
Today we teamed up with MB Electrical Contracting and went straight to work getting the damaged feeders pulled out of the conduit and new ones installed… and look what we found — the red phase was completely corroded all the way through (see pic).
Thanks to an awesome collaboration with the MB crew — Jake and Mike — not only were we able to get a generator on site last night to keep everyone powered, but today we pulled out 180 feet of feeder cable to the tap box, installed a brand-new set of feeders, and had the buildings fully energized again.
We also brought in a skid steer to clear the area and help with the pull — teamwork at its best.
Big shout-outs to:
👏 Shawn
👏 Jake & Mike (MB Electric)
👏 Pat and Jarred from Eversource
👏 And of course my buddy Michael Bowlby owner of MB Electrical contracting — none of this would’ve happened without everyone jumping in.
From an emergency call Thursday at 4 PM to fully repaired and running by 4 PM Friday — what a 24-hour turnaround.
This is what great crews and great partnerships in the electrical trade look like. 💪⚡