04/02/2026
🚿 Another beautiful bathroom transformation by King’s Plumbing Inc.!
This project was a bit of a head-scratcher—but we love a challenge.
We converted an existing shower into a full tub setup, which required: ✔️ Modifying the drain system
✔️ Installing a new valve
✔️ Removing a 30x60 shower and fitting a 32x60 tub
Once we opened everything up, we found the space measured 62.5”, so we custom-built out the side wall by 2.5” to ensure a perfect, secure fit.
We also completed the finishing touches: • Floor trim installation
• Grab bar installation
• Shower door install
• Ceiling transition trim
• Floor transitions
From start to finish, this one turned out great—and the transformation speaks for itself!
📸 (Before & After photos below)
If you’re thinking about upgrading your bathroom, feel free to reach out—we’d be happy to help bring your vision to life.