01/30/2026
OSHPD/HCAI-3 doesn’t have to slow healthcare projects down if design and construction are aligned from day one.
On this 14,000 SF PACE center tenant improvement, we’re in the demolition phase, adapting an existing building to meet OSHPD/HCAI-3 HVAC and life-safety requirements. In a traditional delivery model, this is where friction shows up through redesigns, RFIs, cost creep, and schedule uncertainty.
Design-build changes that dynamic.
Because our design and construction teams are operating as one, and because we have deep, hands-on experience delivering under OSHPD/HCAI-3, we know what to look out for during construction.
That experience allows us to anticipate compliance challenges early, validate constructability, and make informed decisions before issues turn into delays or change orders.
Existing mechanical systems, infrastructure limitations, and compliance constraints are addressed together, not in silos.
The result:
• Cleaner OSHPD/HCAI-3 pathways
• Fewer surprises during plan review and inspection
• Better cost control
• Faster progression toward opening
• A smoother experience for the operator
For PACE providers, this isn’t just about construction efficiency. It’s about opening sooner, serving seniors earlier, and delivering care with dignity in a compliant, reliable environment.
That’s the real advantage of design-build when healthcare compliance is non-negotiable.