03/22/2026
The construction of our building has been successfully completed, thanks to the tireless efforts of Zach. The extensive work involved meticulous grading, the importation of 6 loads of fill dirt, the installation of geotextile fabric, and 6 loads of crushed stone, ultimately yielding a well-designed driveway and staging area. Now, we can proceed with organizing the interior and setting up operations.