07/04/2024
When the customer needs there floors resurfaced with minimum shutdown they can rely on the team at Flex Epoxy Flooring Inc. to compete a troweled epoxy mortar from prep to topcoat in 2 days on 3500SF.
This customers complaint was they have unsafe conditions due to the deteriorating concrete as well as spending a lot of money in maintenance costs to repair there forklift equipment. We were able to provide a robust flooring system that permanently bonded and resurfaced the existing concrete to create a easy to maintain, smooth, non skid and very durable upgrade.
www.Flexepoxyflooring.com