06/18/2026
Progress from every angle!
This epic build continues to evolve, and the next pieces are underway; the batting cage/barn and pool house. This aerial view gives a perfect look at the scale of the build, the coordination happening on site, and the craftsmanship that continues into each phase!
Still in the middle of construction, but the vision is already clear.
Stay tuned as more comes to life!
Project Team:
Architect:
Structural: Sullivan Structures
Interiors: J. Dimas Design H O U S E OF H A M M E L
Civil: Oak Hill Engineering
Builder: Top Notch